永发信息网

【翻译】由于原定的船期突然发生改变

答案:1  悬赏:0  手机版
解决时间 2021-03-07 17:16
  • 提问者网友:欺烟
  • 2021-03-07 12:28
【翻译】由于原定的船期突然发生改变
最佳答案
  • 五星知识达人网友:从此江山别
  • 2021-03-07 14:01
Due to the sudden change of the cargo ship which was originally scheduled on March 19, the ship was not able to berth as of now. As a result, there will be an extra unloading charge in the amount of 500RMB. Please confirm this extra charge, which is unavoidable.
我要举报
如以上回答内容为低俗、色情、不良、暴力、侵权、涉及违法等信息,可以点下面链接进行举报!
点此我要举报以上问答信息
大家都在看
推荐资讯