永发信息网

水电站英语怎么说

答案:1  悬赏:40  手机版
解决时间 2021-03-19 08:59
  • 提问者网友:献世佛
  • 2021-03-18 23:28
水电站英语怎么说
最佳答案
  • 五星知识达人网友:空山清雨
  • 2021-03-19 00:54
问题一:“水力发电站”英语怎么说 水力发电站,可译作:
Hydropower station
Hydroelectric power station问题二:水电厂或水电站的英文怎么写? hydro-electric power station
Hydropower Plant 三峡好像就用的这个问题三:水利水电工程专业用英语怎么说?? my major is Water Resources and Hydropower Engineering
或者my specialty is Water Resources and Hydropower Engineering
很少说major of Water Resources and Hydropower Engineering问题四:"发电站"用英语怎么说 power plant?问题五:“电站”用英文怎么说? 电站:
1. generating plant
其它相关解释:
问题六:水利水电工程 用英语怎么说 水利水电工程: Water Conservancy and Hydropower Engineering 水利电力学院: Institute of Water Conservancy and Electric Power问题七:某水电站资料,急求英语翻译,谢谢! 1, the diversion system information
Plant water reservoir system is located between the mountains and down the body, using a hole two machines, inclined shaft, tail plant layout program, there are two identical hydraulic unit. Water Conveyance System main buildings include: the upper reservoir inlet / outlet, diversion tunnel, reinforced concrete manifold, high pressure steel pipes, tailrace tunnel and the lower reservoir inlet / outlet and so on.
Upper reservoir inlet / outlet is located in the cove from the left Batou about 500m, using the slope shaft-style layout, flow into the intake side, the same two intakes arranged by beams and vortex diffuser composed of a single length 100m, width vortex beams 40m, high 30m, bottom elevation 400m, imports from four trash rack. Between the diffuser and the gate well as the 10m × 13m (width × height) of the rectangular opening paragraph, emergency gate spacing imports 120m, gate size 10.0m × 12m (width × height). Intake open channel segments depending on the terrain in front of the plane with curved layout, length 450m, width 90m ~ 150m, bottom elevation of 400m ~ 420m, 80m imports from Nullah frontier and stopped at the sand ridge located prescribe.
Center spacing of the two diversion tunnel 80m, Diameter 12m, the hole axis azimuth of N87 ° E. On the flat segment fell to 15% elevation 400m down the slope, then dip 60 °, 500m long high-pressure inclined, down to 100m elevation, the lower flat section is conn......余下全文>>问题八:巴基斯坦鲁阿特水电站英语怎么说 巴基斯坦鲁阿特水电站_有道翻译
翻译结果:
Pakistan the hydropower station
station
英 ['ste??(?)n]
美 [?ste???n]
n. 车站;驻地;地位;身份
vt. 配置;安置;驻扎
Station 车站,车站,站
Union Station 联合车站,联合车站 (华盛顿特区),联合车站 (华盛顿地铁)
Shiroishi Station 白石车站,白石站 (熊本县),白石车站
我要举报
如以上回答内容为低俗、色情、不良、暴力、侵权、涉及违法等信息,可以点下面链接进行举报!
点此我要举报以上问答信息
大家都在看
推荐资讯