1. 振动耐磨试验机维修
2.
R 180/530 TE 30
1.振动槽内衬保护已磨损,内部槽底已露铁:
①去除残留旧衬(高温烤溶化)
②槽底抛光
③槽底过酸水池,除锈,然后喷砂处理(增加新衬的附着力)
④重新灌胶(高温炉内3个小时)
⑤冷却去模
⑥槽口上机床处理(抛光,洗平)
2.外观油漆磨损,需翻新,故重新喷涂
①去除表面旧漆,打磨,清洗
②除锈,清洗,抛光
③磷化(所形成的磷化膜是一层稳定的不导电的隔离层,有效地阻止涂层腐蚀)
④烘干(烘干水分,准备涂漆)
⑤打原子灰(除去表面粒状杂质并增加一定粗糙度以增加油漆附着力)
⑥喷漆,进烤房固化
维修及保养费用:2820欧元
中国至德国往返运费:430欧元
合计费用:3250欧元
3. 现金。(汇率按下单当日中国银行汇率计算)
1. Vibration wear test machine maintenance
2. R 180/530 TE 30
1. Vibrating trough lining has worn to protect the internal bottom has exposed iron:
·
① Remove the old lining residue (high-temperature baking melt)
② bottom polishing
③ bottom peracid pools, rust, and then blasting treatment (to add a new lining of adhesion)
④ re-filling plastic (high-temperature furnace 3 hours)
⑤ cooling to the mold
⑥ notch on the machine tool processing (polishing, wash-ping)
2. Exterior paint wear, needs renovation, it re-spray
① Remove the surface of the old paint, sanding, cleaning
② rust, cleaning, polishing
③ phosphide (the formation of phosphate coating is a layer of stable non-conductive isolation layer, effectively prevent corrosion coating)
④ Drying (drying moisture, ready to paint)
⑤ play Putty (excluding the surface of particulate impurities and to increase a certain roughness in order to increase paint adhesion)
⑥ painting, into the barn-curing
Repair and maintenance costs: € 2820
Round-trip transportation from China to Germany: € 430
Total cost: € 3250
3. Cash. (The exchange rate by pressing a single day of the Bank of China exchange rate)
1 vibration machine maintenance. Wear
2.
R 180/530 TE 30
1 vibration slot inner protection has worn, internal groove bottom already dew iron:
(1) removing residues lining baked melt temperature (old),
2 groove bottom polishing
3 groove bottom acidic pool, derusting, then piating (add new lining adhesion)
4 to glue GaoWenLu (within 3 hours),
5 to mold cooling
6 the slot machine processing (polishing, wash flat)
2 appearance, paint, wear needs face-lifting repainting
(1) removing surface cleaning, polishing, old paint
2 derusting, cleaning, polishing
3 phosphating (formed by a layer of phosphating film is an unstable conductive insulating layer, effectively prevent coating corrosion)
4, water drying drying (paint),
5 dozen putty (remove impurities and increase the granular surface roughness to increase adhesion of the paint certain),
Fourthly, curing barn curing paint
Repair and maintenance fee: 2820 euros
China to Germany and freight: 430 euros
Total expenses: 32.5 euros
3 the cash. By placing the currency (bank of China exchange rates)